<?xml version="1.0" encoding="UTF-8"?>
<ArticleSet>
  <Article>
    <Journal>
      <PublisherName></PublisherName>
      <JournalTitle>Journal of Resource Management and Decision Engineering</JournalTitle>
      <Issn></Issn>
      <Volume></Volume>
      <Issue>In Press</Issue>
      <PubDate PubStatus="epublish">
        <Year>2027</Year>
        <Month>01</Month>
        <Day>01</Day>
      </PubDate>
    </Journal>
    <ArticleTitle>Designing an Intelligent Decision-Support Model for Risk and Delay Management in Industrial Projects Using an Integration of Monte Carlo Simulation and Machine Learning in Dynamic Uncertainty Environments</ArticleTitle>
    <VernacularTitle>Designing an Intelligent Decision-Support Model for Risk and Delay Management in Industrial Projects Using an Integration of Monte Carlo Simulation and Machine Learning in Dynamic Uncertainty Environments</VernacularTitle>
    <FirstPage>1</FirstPage>
    <LastPage>16</LastPage>
    <Language>EN</Language>
    <AuthorList>
      <Author>
        <FirstName></FirstName>
        <LastName></LastName>
        <Affiliation></Affiliation>
      </Author>
    </AuthorList>
    <PublicationType>Journal Article</PublicationType>
    <History>
      <PubDate PubStatus="received">
        <Year>2026</Year>
        <Month>04</Month>
        <Day>05</Day>
      </PubDate>
    </History>
    <Abstract>&lt;p&gt;In recent years, industrial projects have faced increasing complexity, uncertainty, and interdependence among project activities. According to international project management reports, approximately 60% to 80% of large-scale industrial projects experience schedule delays, and nearly 45% encounter cost overruns of more than 20% compared with the initial budget. The objective of this study is to design an intelligent decision-support model for predicting and managing risk and delay in industrial projects by integrating Monte Carlo simulation and machine learning algorithms. In this study, performance data from previous projects, including activity schedules, resource consumption levels, cost variations, and risk indicators, are first collected. Then, using Monte Carlo simulation, more than 10,000 probabilistic project execution scenarios are generated to model uncertainty in time and cost from a probabilistic perspective. Subsequently, machine learning algorithms, such as Random Forest and Gradient Boosting, are applied to identify delay patterns and predict schedule deviation with a targeted accuracy of approximately 85% to 92%. The expected results indicate that the proposed hybrid model can improve the accuracy of project delay prediction by up to 30% compared with traditional project planning methods, including CPM/PERT, and reduce the mean error in estimating project completion time from approximately 18% to less than 10%. Furthermore, the model is capable of identifying critical risks at least 2 to 4 weeks earlier than conventional methods, which can play an important role in reducing additional costs and improving resource productivity.&lt;/p&gt;</Abstract>
    <ObjectList>
      <Object Type="keyword">
        <Param Name="value">Project management</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">Monte Carlo simulation</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">machine learning</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">project risk</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">project delay</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">intelligent decision-support system</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">uncertainty</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">schedule optimization</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">project data analytics</Param>
      </Object>
      <Object Type="keyword">
        <Param Name="value">industrial engineering</Param>
      </Object>
    </ObjectList>
    <ArchiveCopySource DocType="pdf">https://www.journalrmde.com/index.php/jrmde/article/download/392/344</ArchiveCopySource>
  </Article>
</ArticleSet>
